|
Original URL: https://www.bakerschoolpto.org/april-29-2015.html Archived Date: 10/4/2026 Name of Committee: Baker Site Council
Meeting Date: April 29, 2015 Time: 8:00 a.m. – 9:00 a.m. Meeting Location: Baker School Members Present: X Emily Engeland X Sonia Schneider X Timothy Sullivan Staff Present and Participating: Dr. Mary, Brown, Linda Rodriguez-Hutson, Denrod Fowler, Susan Balogh, Paula Ewenstein, Laura Richardson (late) Discussion of modular classroom layout and visit to location of installation. Discussion over color. Decision over what classes to move to modular still underway with likelihood that is will be in K-5 grades. Modular classrooms should have better technology, likely with smart-boards, and hopefully with a dedicated laptop cart. They will be air conditioned. To some degree class decision will be impacted by override since passage will determine classroom staffing. Dr. Brown reviewed the hiring needs for next year, both with and without an override. Some new staffing, such as ELL teachers, psychologist, and special education support (from .5 to 1.0 FTE) will occur with or without an override. Additional staffing with an override could include maintaining 4 sections in fifth grade, additional psychology support, an additional math specialist, ECS and OT support. Original URL: https://www.bakerschoolpto.org/april-7-2015.html Archived Date: 10/4/2026 Name of Committee: Baker Site Council
Meeting Date: April 7, 2015 Time: 8:00 a.m. – 9:00 a.m. Meeting Location: Baker School Members Present: X Emily Engeland Sonia Schneider X Timothy Sullivan Staff Present and Participating: Dr. Mary, Brown, Denrod Fowler, Susan Balogh, Paula Ewenstein Dr. Brown suggested amendments to the School Improvement Plan (SIP) based on what the teacher and parent survey said. Should SIP include something on technology. Discussion about ETS use at Baker, when technology skills is taught and when keyboarding should be taught. There is not currently a detailed scope and sequence for the technology curriculum. Reach out to 9th grade teachers to find out what they are using and to identify deficiencies. This could then generate staff training ideas. There was a discussion about lack of library time for grades 6-8 and a discussion about how to help with library. There was a discussion about communications from Baker. |
AuthorThe Baker School PTO Archives
September 2026
Categories
All
|
|
Baker School PTO
205 Beverly Road Chestnut Hill, MA 02467 Email: [email protected] Website: bakerschoolpto.org Follow Us: |
501(c)(3) non-profit organization
EIN: 31-1682431
RSS Feed
